During the installation process of Cable tray, you need to pay attention to the following matters:
Preparation work: First, you should be familiar with the design drawings and coordinate with plumbing, ventilation, air conditioning and other professionals to determine the installation location and direction of the Cable tray. At the same time, calculate the amount of bridges, accessories, and accessories, and prepare the required main tools, such as electrical tools, impact drills, hand drills, tape measures, etc.
Check the materials: the bridge and its accessories and accessories should be complete, and their models and specifications should meet the design requirements. The inside and outside of the bridge should be smooth and flat, without burrs, twists, warping and other deformations.
Measurement and positioning: Determine the installation position of the bridge according to the design drawings, and use measuring tools for accurate positioning and marking.
Fixed bracket: The installation of the bracket should comply with relevant technical standards to ensure the level and verticality of the bracket. The spacing between fixed brackets should be determined according to the length and weight of the bridge to ensure the stability and load-bearing capacity of the bridge.
Install the bridge: According to the marked position, use appropriate fixing methods (such as expansion bolts) to fix the bridge to the bracket. Make sure the connection between the bridge and the bracket is firm and reliable.
Adjust the bridge: After the installation is completed, adjust the bridge to ensure that its horizontality, verticality and straightness meet the requirements. At the same time, check whether the connection between the bridge and the bracket is tight to prevent the bridge from shaking or shifting.
Grounding treatment: Carry out grounding treatment of the bridge according to the design requirements. Make sure the ground wire is firmly connected and the ground resistance meets the specifications.
Safety protection: During the installation process, necessary safety protection measures should be taken, such as wearing safety helmets, gloves, etc., to prevent accidental injuries.
Quality inspection: After the installation is completed, quality inspection is carried out to ensure that the installation quality of the bridge meets the design requirements and relevant standards.
In short, there are many things that need to be paid attention to during the installation process of Cable tray. From preparation work to quality inspection after installation, it is necessary to strictly follow the specifications and requirements to ensure the quality and safety of Cable tray installation.
×